Seven details to focus on before and after jigger installation
The importance of jigger installation must be known to everyone, it directly affects whether the jigger can work normally in the future, and the same jigger post-installation inspection work is also the top priority. Reasonable installation can ensure the normal operation of the jigger, and the post-installation inspection to avoid accidents in the equipment. Here are seven important details for you to explain before and after the installation of jigger.
1、Jigger should be installed on a horizontal concrete foundation and fixed with ground bolts.
2、The installation should pay attention to the verticality of the main body and the level.
3、After installation, check whether the bolts of each part are loose and whether the main machine hatch is tightened, if so, please tighten it.
4、Configure the power line and control switch according to the power of the equipment, after checking, carry out the empty load test run, the test run is normal and the production can be carried out.
5、Bearings bear all the load of the equipment, good lubrication has a great relationship to the bearing life, which directly affects the service life of the jigger and the operation rate, so the lubricant injected is required to be clean and well sealed.
6, the newly installed wheel hoop is easy to loosening should be frequently checked, pay attention to the various parts of the equipment is working properly. Pay attention to check the degree of wear and tear of easy-to-wear parts, always pay attention to the replacement of worn parts.
7, put the movable device of the base frame plane, should remove the dust and other things to avoid the machine can not meet the crushing materials when the movable bearing can not move on the base frame, so that serious accidents.
没有了
The main working principle of the sawtooth wave jigger2023-04-19

Jianan Machinery--Professional Customised Jigger Machine
30 years focus on jigger source manufacturer
